Mando America Corporation
Plymouth, MI
Two large elevated mezzanines were built on concrete floors with iron framing and stairs, along with a removable railing for hi-lo access and a concrete pad isolated from vibrations for a test chamber. A cooling tower with dual pumps and a chemical treatment system were installed with a large air compressor system, airline loop and drops with a water separator, numerous transformers/breaker boxes, and applied a seamless epoxy industrial coating system on the floor.

|
|